City block "VTB arena Park", is located at the address: Moscow, Leningradsky Prospekt d. 36 with a total area of walling 38 000 m2.
The case 1
Completed façade 1.1 and 1.2 elements of stone.
Completed works on installation of gold bars on the facade 1.3
Completed works on installation of the painted sheet on the patio.
the
The case 2
work has Begun on the installation of natural stone elements.
the
Case 3
works on assembling and installation of insulation made of mineral wool on the facade of 3.1, 3.2, 3.3, 3.4.
the
Case 4
Continuation of work on three sides.
Tower "Evolution", plot 2-3, MIBC "Moscow-city"
check Assembly of racks and handrails on the parapet of the puck.
Installation of claddings in places of connection of the secondary strips.
introducing the sealant between the low tide and the concrete columns.
installation of waterproofing, installation of insulation and Tyvek on the columns.
Installation of insulation made of mineral wool on the columns.
Installation of aluminum ventilated façade cassettes.
Set of decorative elements at the joints of the secondary feeds, the application of sealant, primer and painting.
Veneer metal boxes on the racks balustrades DSPS.Administrative and public business complex "NEVSKY town HALL" is located at the address: St.-Petersburg, the Central administrative area (the Total area of walling - 736 100 m2)
Gluing and mounting of a ground stone for external facades. Installation profile sheet, rebar and formwork under a concrete floor TV Studio.
Install retainer plate and decorative cap in the Atrium.Multifunctional office and recreational complex "Federation"
the Continuation of the manufacture of load-bearing steel construction and shipment of the first batch of deliveries to the construction site.
Development and start of manufacture of the matrices necessary for the pressing of special aluminum profiles façade systems.Tower "Eurasia", plot 12 of the MIBC "Moscow-city", an area of 74 000 m2
Installation running bridges on the stylobate in the area of "Casino" for maintenance of the tower.The floating restaurant "Sadko"
work on vertical glazing of the 1st, 2nd and 3rd tier.
work on the glazing of eaves of the 1st, 2nd and 3rd tier.