City block "VTB arena Park", is located at the address: Moscow, Leningradsky Prospekt d. 36 with a total area of walling 38 000 m2.
The body 1
On the facades of 1.2 and 1.3 preparatory works for the installation of the gratings.
preliminary work in the inner courtyards of the inner housing
Started work on the device external painted sheet for fixing thermal insulation made of mineral wool.
the
2
work is Underway on the device of external painted sheet for fixing thermal insulation made of mineral wool.
the
Building 3
Complete installation of post-and-beam frame around the perimeter.
Received the approval to glass on the facades 3, 4, 5.
Received approval for use of stone in buildings 3 and 5 – Iranian travertine, and 4 building – stone Thala
work has Begun on the installation of inner ducts and the mounting of insulation of mineral wool.
the
Building 4
On 4-11 floors started work on the installation of the frame.Clinical-diagnostic Center "MEDSI" located to the address: Moscow, ul Krasnaya Presnya, d. 16/2
the Installation of the separate Windows at elevation -1,200
work Continues on installation of metal in the Bay window
the Preparatory work for the installation of frame the ventilated facade system
the Installation of fire cut offs, waterproofing, and joining of monolithic reinforced concrete.
Dolphinarium "Macquarium" at the exhibition centre, located at the address: Moscow, PR-t Mira,119,23
seam Sealing on the back side of the facade.
work on glazing the rear side of the facade.
4 Installing revolving doors at entrance lobby, the installation of fire and entrance doors.
Install the attached straps and the sealing on the lower floors of the main facade.
Install colored tapes, insulation of mineral wool, sealing of seams.
Mounting and sealing decorative pipe.
Installation of metal structures on the grille.
End of works on installation of the cap stone.Tower "Evolution", plot 2-3, MIBC "Moscow-city"
the Installation of the supporting structure of the balustrade
Start the work on the glazing of the balustrades.
Start of work covering the technical floor of aluminum cassettes with perforation gradient (puck).
Installation of posts and beams balustrade in the design position. Welding works.
Device metal box profile
the Manufacture of the frame profile. Welding works.
Installation of perforated tape on stripah.
Multifunctional office and recreational complex "Federation"
project Development production payment (PDP) for the installation of structures.
Development and manufacturing of specialized tooling for the installation of structures.The floating restaurant "Sadko"
Installation of steel structures 2nd tier interior walls.
Installation of metal structures of the 2nd tier of the exterior facade.