City block "VTB arena Park", is located at the address: Moscow, Leningradsky Prospekt d. 36 with a total area of walling 38 000 m2.
the
Case 1
On the facade 1.2 installation of structures lining the stone parapet.
work is Underway on the installation of substructures for stone lamellas technical 3 FL.
work is Underway on the glazing of the dome.
the
2
work is Underway on installation of cornices on the facade of 2.2
the
Case 3
Completing the installation angles and siliconizing.
Started installation work of aluminium structures to the stained glass in the 13th and 14th floor.
the
Case 4
the Beginning of installation 2 and 3-th floor – the unit of frame and glazing on the perimeter.
the
Building 5
performance of glazing façade 5.1, 5.2 and 5.4.
Tower "Evolution", plot 2-3, MIBC "Moscow-city"
Productive work on finishing the staining of the decorative covering and balustrade crown.
Sealing of the joints of the segments.
Sanding, cleaning and priming of the uprights of the balustrade.
the Colouring of the nodes of an adjunction with the puck.
setting the cassette and a handle for washer.
Painting small arches of the crown.
Paint work on the arch.Administrative and public business complex "NEVSKY town HALL" is located at the address: St.-Petersburg, the Central administrative area (the Total area of walling - 736 100 m2)
Монтаж входной группы на фасаде на ул. Новгородской.
Монтаж "даблскин" по внешним фасадам.
Монтаж остекления входной группы по центральному фасаду.
Установка декоративной крышки в Атриуме.
Multifunctional office and recreational complex "Federation"
Completion of installation works on installation of bearing steel structures of the topping (Phase 3, Phase 4).
to the Beginning of construction of the supporting structure the supporting frame under the crane Derrick.
the Production of aluminum profiles and components of facade and roofing systems.
Manufacturing brackets for fastening of facade and roofing.
Start of production of glass products for façade constructions.Tower "Eurasia", plot 12 of the MIBC "Moscow-city", an area of 74 000 m2
Installing glass visor, lined with tapes of stainless steel above the entrance to the apartments in high-rise buildings.
the ventilated façade on the stylobate and the stone cladding in the area of "Casino", "Shopping Mall", "North lobby" and go to the tower.The floating restaurant "Sadko"
work on siliconizing seams.
door Installation.